Roof replacement and interior lining remediation at Kaiwharawhara Substation, Wellington. A challenging and tight work area that included a scaffold installation into a restricted high voltage switchyard and limited access. This project was successfully delivered with careful planning and management for Transpower and Downer NZ alongside Ruruku, Tararua Roofing and Civil Works Scaffolding.
Pickering St, Kaiwharawhara